Fannie Mae – Adopting Agility in Business Using SAFe

“SAFe provided the agility, visibility, and transparency needed to ensure we could integrate with numerous other efforts, get predictable in our delivery, and ensure timelines are met.”

David McMunn, Director of Fannie Mae’s Agile COE

Challenge:

Within three years, the organization would need to stand-up an entirely new business model that would change the way securities are issued to the market—and do so within aggressive timelines.

Industry:

Financial Services, Government

Results:

  • Releases now happen every month, instead of once or twice a year.
  • They integrate reliably every two weeks.
  • Fannie Mae reduced delivery risks.
  • The organization reduced the defect rate substantially.
  • Teams now deliver more than 30 attributes per sprint compared to 2-5 before.
  • Velocity increased from 10 story points to more than 30.

Best Practices:

  • Sync cadence – Establishing a common cadence was critical to success. Engineering practices must evolve in order to comply with bi­modal governance.
  • Work on database modeling upfront – For any data-heavy effort, perform advance work on database modeling to avoid the impact of changes identified later in the sprint.
  • Develop a playbook – Such guidance reduces rework for multiple teams working in parallel.

Introduction

Fannie Mae is the leading provider of mortgage financing in the United States. Operating under a congressional charter, Fannie Mae—and its sibling organization Freddie Mac—play an important role in the nation’s housing finance system; they provide liquidity, stability, and affordability to the mortgage market.

Coming out of the housing crisis in 2013, Fannie Mae recognized that the lending environment it was moving into required it to be even more responsive to meet rapidly changing customer needs. Further, Fannie Mae recognized that agility was critical to achieving this objective—not just in technology, but across the organization.

In January 2015, Fannie Mae was preparing to align with guidance provided by the Federal Housing Finance Agency (FHFA) and Congress, under a new joint venture named Common Securitization Solutions (CSS). As part of this effort, Fannie Mae undertook an initiative to transform some of their key internal business processes to align with CSS to build a universal securitization platform for the issuance and management of mortgage-backed securities.

SAFe for Mortgage Financing

Within three years, Fannie Mae planned to develop an entirely new business model that would change the way securities are issued to the market—and do so within aggressive timelines. More than 20 development teams, encompassing over 300 individuals, were needed to integrate development and testing efforts across 30 assets. As Fannie Mae prepared to implement this change, the organization encountered several challenges as the new model was being defined based on continuously evolving requirements.

“When you’re doing a large-scale integration with a lot of data, the number-one factor for success is early integration and early testing,” says Atif Salam, Director of Enterprise Data at Fannie Mae. “The federal mandate required us to mitigate risk from the get-go, and we realized early on it would not be possible following a waterfall approach. There was no better way for us to mitigate that risk than to adopt Agile.”

Overcoming Initial Roadblocks

Enterprise Data’s efforts to adopt Agile uncovered several challenges, both internal and external:

Challenge #1: No Agile capability evident for the initial two teams at the outset of the Enterprise Data initiative.

The first Enterprise Data teams were brand new to Agile, the Scrum methodology and, having been formed specifically for this initiative, working with each other.

Prior to adopting SAFe, Enterprise Data developed a standard on-boarding approach and entrance criteria for standing up new teams. Additionally, external Agile subject matter expertise was brought in to train and work with the teams, and an Agile Mature Model (AMM) was created to baseline behaviors and practices, as well as identify areas for optimization.

Thereafter, once the decision had been made to adopt SAFe, the program began to work through the SAFe Readiness Checklist. The AMM was used to set target benchmarks that all program teams were required to meet in order to ensure there was sufficient capability in place from which to scale.

Challenge #2: At the outset of the Enterprise Data initiative, a Scrum team could only complete a single user story due to inflexible architecture, end-to-end testing challenges, and numerous build constraints. Further, it was typical for the work to be gated by subject matter expertise between developers who viewed data attributes as a data point, comprised of both sourcing and vending complexities, that could only be implemented sequentially.

In response, technical leads focused on eliminating constraints, reducing complexity, and optimizing workflow. Specifically, Technical Leads worked with the teams to leverage cross-functional team/paired programming constructs to augment technical expertise. As a result, the teams began to view data attributes not as a data point, comprised of both sourcing and vending complexities, but rather as having two distinct pieces of business value, specifically sourcing and vending.

SAFe for Mortgage Financing

Additionally, they made the effort to move system integration testing (SIT), as well as user acceptance testing (UAT), left into the Scrum team. As a result, and over time, each team began to complete multiple user stories within a given sprint. Additionally, the organization adopted an emergent design mindset, formed cross-functional Agile feature teams, and aligned to a common cadence that synchronized their activities (e.g. sprint planning, Scrum-of-Scrums, sprint reviews).

Challenge #3: At the outset of Enterprise Data’s journey, complexity was further complicated by the fact that teams were required to develop and integrate their code in the same mainline, thereby replacing branching as an accepted technical practice. Additionally, Fannie Mae required new release traceability management that would satisfy corporate and federal governance requirements.

To address these challenges, technical leads and shared services focused on building a continuous integration capability, across all teams, using the same codebase. The organization had always had application lifecycle management (ALM), however, it needed to re­think continuous integration to realize true efficiencies. Over the course of 10 months, the organization focused on leveraging automation to reduce the time to implement builds from once every six months to multiple times a day.

Additionally, Enterprise Data adopted behavior-driven development engineering practices for traceability, automated testing, and prototyping.

SAFe for Mortgage Financing

Challenge #4: Upstream technical dependencies specific to architecture, database design/modeling, and test data provisioning prevented the teams from completing a single user story within the two-week sprint cadence.

In addition to the technical challenges the teams were facing, there were also multiple upstream dependencies on architecture, data modeling, and test data management that they had to resolve before a User Story could be implemented by a team working in a two-week cadence.

Initially, working ahead of the teams, a group of business analysts were assembled and assigned to groom the program backlog sufficiently so that User Stories met, or exceeded, 80% of the sprint team’s Definition of Ready. Despite this focus, however, there was barely enough ready work in the program backlog for the teams to bring into their respective sprint planning. This was due to the lead times required to resolve upstream dependencies as well as the need to respond to continually changing requirements.

In preparation for scaling, Enterprise Data worked with their business stakeholders to create a roadmap of features spanning one business quarter. Simultaneously, they focused on optimizing backlog health, sufficient in depth to support the Agile teams, for at least two consecutive sprints. Additionally, adopting a system perspective, the entire value stream was analyzed to better anticipate, and mitigate for, internal/external technical dependencies.

Challenge #5: The organization’s culture was accustomed to working within a traditional implementation methodology.

At the outset, Fannie Mae had a traditional command and control culture, supported by a broader ecosystem of corporate functions that had to change to support Agile. Those leading the change made a significant effort to work with leadership and management to pivot from the traditional role of directing delivery to becoming Lean-Agile leaders and critical change agents, both supporting the teams as well as modeling the values and principles of the Agile Manifesto.

As already noted, leadership and management changed their focus to clearing impediments impacting the teams. Additionally, they influenced corporate functions to align in support of Agile, get the business integrated and involved, as well as to put the pieces in place to create an environment focused on continuous learning. “Historically we would have seen challenges as failures in requirements or development rather than opportunities to fail fast and learn, and improve,” Salam explains.

While still new to their roles, the Lean-Agile leaders infused a sense of purpose in the teams and gave them autonomy to implement the work while decentralizing decision-making and minimizing constraints.

SAFe: Agility. Visibility. Transparency.

Although Fannie Mae had pockets of Agile capability up to this point, leadership understood that a scaled Agile methodology was required to achieve their objectives. Fortunately, individuals within the company had prior success with large-scale Agile deployments using the Scaled Agile Framework® (SAFe®).

Fannie Mae teamed up with an external Scaled Agile Gold partner to develop and mature its Scrum capability and then deploy SAFe. As the first to make the SAFe transition, the Enterprise Data division became the torch bearer.

“We had multiple waterfall efforts, third-party integration, and a hard regulatory mandate that made coordination and execution exceptionally difficult,” explains David McMunn, the Director of Fannie Mae’s Agile Center of Excellence (COE). “SAFe provided the agility, visibility, and transparency needed to ensure we could integrate with the numerous other efforts, get predictable in our delivery, and ensure timelines are met.”

Fannie Mae applied a dogmatic approach to ensure the organization was developing a consistent set of practices across multiple teams at the outset. External coaches delivered Agile, Scrum Master, Product Owner, Leading SAFe (SA), and SAFe for Teams (SP) training. The SAFe training was then mandatory for every new team joining the effort.

Fannie Mae launched its first Agile Release Train (ART) encompassing six programs, across 12 teams, with more than 130 people, in June of 2015. Admittedly, that first Program Increment (PI) offered some learning experiences.

“In spite of all the preparation that went into the backlog, setting expectations, confirming attendance from stakeholders, and the training prior to planning, the first PI was somewhat of a chaotic experience,” says Scott Richardson, Chief Data Officer at Fannie Mae.

Context setting provided by the business, product, and architecture leads took time away from team break-out sessions and, as a result, the teams struggled to resolve all of the open requirements and scope questions to complete their plans.

“But by the end of the second day,” Richardson continues, “we started to see progress.” The teams had mapped out their dependencies on the program board, resolved, owned, accepted, or mitigated (ROAM) all of the known risks in the PI and achieved a Fist of Five confidence score of 3.

“The session offered the very first opportunity for all stakeholders to work together on this multi-million dollar program.” Richardson adds. “A new way of managing large-scale integration efforts at Fannie Mae was emerging that would spread across the technology enterprise.”

Over the next few PIs, the organization knew more clearly how to prepare for the PI planning meeting and confidence scores began averaging 4 and higher.

Modeling Confidence in the New Methodology

During cross-team planning in an early PI, it became clear that several teams were not on track to deliver important capabilities within the targeted timeline. “Some of my best new Agile team leaders offered to throw more people at the problem ‘just this once,’ and crash the schedule like they did in the old days,” Richardson says. “It’s in those moments that you need to model confidence in the Agile method, to be the calm in the eye of the storm.”
Instead, the Agile team leaders were encouraged to go back to the Product Owners regarding the change in priorities and empower them to devise a new minimum viable product. “Within a couple of hours, everything was back on track with planning, and ultimately all the teams delivered, and the external customer delivery was on-time,” Richardson says. “Now they carry this story with them, and are empowered to solve problems and make decisions in truly productive ways. It’s part of the culture.”

SAFe for Mortgage Financing

Gains across the Board

Today, Fannie Mae has come a long way. The Enterprise Data division delivered an integrated solution on time and with much higher quality than was expected for an effort of this size. From a broader perspective, the transformation to SAFe revolutionized how the organization plans for the delivery of large-scale programs.

Fannie Mae has seen improvements on multiple fronts:

  • Reduced risk – Fannie Mae reduced delivery risks through the relentless focus on innovation and automation to ship “production ready” code with higher and higher frequency. They significantly mitigated the risk inherent in complex integration between legacy and new architectures/applications, as well as between internal and external systems.
  • Faster feedback cycles – Enterprise Data delivers system demos and integrated code every two weeks. Releases now happen every month, instead of once or twice a year, for the largest application across the enterprise, with millions of lines of code.
  • Improved predictability – Teams, within the program and across the enterprise, integrate reliably every two weeks.
  • Boosted quality – The organization reduced the defect rate substantially.
  • Increased business value – Teams now deliver more than 30 attributes per sprint compared to 2-5 attributes when Agile was first adopted within Enterprise Data.
  • Better team progress – Teams undergo regular AHR (Agility Health Reviews) cycles and have matured to higher Agile Maturity Model levels.
  • Greater efficiency – Fannie Mae realizes significant efficiency through a reduction in technical debt.

After the initial deployment, the division rolled out SAFe to the rest of the organization, training up to 600 people on Leading SAFe, SAFe Advanced Scrum Master, SAFe Scrum Master, SAFe Product Manager/Product Owner, and SAFe for Teams, depending on roles. Several employees went on to achieve their SPC certification.

Currently, Fannie Mae runs three ARTs. The Enterprise Data ART recently completed its 13th PI. Additionally, there are more than 200 Lean-Agile teams across Enterprise IT, encompassing over 3,000 people. Functional and business portfolios are adopting lightweight Lean-Agile values and practices as part of their day-to-day activities.

“This way of working has spread across the organization,” Salam says. “It’s changing the way we deliver for the customer, the way we hire and do our budgeting, and is continuously extending further and further into the business.”

Back to: All Case Studies

Suggested Case Study:

Dutch Tax and Customs Administration

Australia Post – Implementing SAFe in Delivery Services

“SAFe has really helped bring the organization along its transformation journey. Its real value has been in the way it links strategy with decentralized execution, using metrics to enable a high level of transparency and fact-based decision making to focus on achieving business outcomes.”

Natalie Field, Head of MyPost Consumer

Challenge:

Effectively deliver solutions that sustain and further enable Australia Post as a trusted services provider, and delight customers with personalized digital products and services.

Industry:

Delivery Services

Results:

  • 100-fold increase in yearly production deployments with 98% cost reduction, enabling iterative product development
  • 400% Agile Release Train productivity increase over 18 months
  • Strong overall delivery predictability of 80%+
  • First-Time Delivery rate improved by 7 percentage points
  • Net Promoter Score rose by 8 points
  • Increased employee satisfaction and engagement

Best Practices:

  • Establish a learning and improvement mindset – Place a primary focus on learning and continuous improvement across all facets of delivery to achieve consistent growth in maturity and effectiveness.
  • Measure outcomes – Enabling a metrics and measurement capability links teams to business strategy and is key to ensuring business outcomes are effectively achieved.
  • Align to DevOps principles – Building a strong technology delivery platform aligned to DevOps principles enables iterative and innovative product
  • Focus on the entire system of work – Build organizational advocacy and sustainability by facilitating change and enablement for shared teams that support and govern Agile Release Trains.

Introduction

Australia Post is Australia’s iconic postal services provider. For 208 years, the organization has been integral to how people and communities connect across Australia. Through a collective workforce of over 50,000 people, Australia Post serves communities, citizens, and businesses, from large corporations to government departments.

Australia Post - Implementing SAFe in Delivery Services

Like many organizations, Australia Post’s business has been disrupted and must transform to adapt to the digital era. Traditional business pillars such as letters are in persistent decline, while the company faces fierce competition, but also immense opportunity with the growth of ecommerce. For Australia Post, that opportunity lies in creating sustainable competitive advantage through trusted relationships between consumers, businesses, and government.

Given these forces, Australia Post needed a new way of working to both sustain and further enable the organization as a trusted services provider, and to delight its customers with personalized digital products and services.

SAFe: Driving Change with Lean Structure and Common Language

Over the past four years, Australia Post has invested in its technology, people, and culture to change the way it works to focus on customer experiences and continuous innovation. To help achieve this agility in business, Australia Post selected and adopted the Scaled Agile Framework® (SAFe®) not only as an operating model but as a tool for change. With SAFe, the organization aims to describe, communicate, and build an understanding of how to leverage Lean and Agile principles across the organization.

“The structure and discipline outlined in SAFe have been a powerful way to communicate a different way of working,” says Daniel Fajerman, Head of Digital Engineering. “Using an industry-proven framework offered a strong basis to start the conversation about working differently, providing a common language and consistent base to work off.”

Achieving Sustainable Change

The goal at Australia Post is sustainable, lasting change that fundamentally shifts how the organization approaches and delivers against its strategies. To do so, Australia Post must equip its people with knowledge and the ability to advocate for and be a part of this new way of working.

A broad and comprehensive training and enablement strategy was rolled out across the organization to build experience and maturity. With help from Mark Richards of CoActivation, a Scaled Agile partner, Australia Post trained more than 900 people in Leading SAFe® and SAFe for Teams® courses. This included key roles across executive leadership, within business functions such as finance, risk, architecture, security, marketing and sales, and of course technology leadership and teams.

Australia Post - Implementing SAFe in Delivery Services

From the beginning, Australia Post applied a persistent focus on cadence and synchronization – keys to building alignment and embedding disciplined delivery practices across diverse teams. With all of Australia Post on the same sprint (and then Program Increment) cadence, scaling teams and ultimately forming these into Agile Release Trains (ARTs) became a natural evolution.

Achieving sustainable change focused on four key interrelated areas of emphasis across the organization:

  • Cross-functional, long-running teams – Moving from transient project teams to cross-functional, long-running teams aligned to customer experiences was a foundational, critical change to the way people work.
  • Culture – Australia Post invested significantly in evolving the culture of the organization to one where curiosity, innovation, and a learning mindset predominate.
  • Technology enablement – Beyond cultural and process changes, improving delivery flow and time-to-value requires an effective build pipeline and deployment infrastructure aligned to DevOps principles.
  • System of work – Implementing a new way of working spans well beyond delivery teams to every part of the organization that supports the delivery of business initiatives. The change team worked closely with shared services groups to tailor approaches to enable and meet their needs under the Framework, including new innovative funding and governance models.

This multi-pronged approach formed sustainable building blocks for change and enablement. With the goal of implementing Agile Release Trains (ARTs), the early focus was on long-running teams and culture to allow maturity to build and grow. The greatest traction came with the advocacy and leadership of business sponsors and leads, who understood the increased business opportunity and had confidence in the delivery model.

MyPost Consumer – Creating a Platform for Personalized Services

Australia Post - Implementing SAFe in Delivery Services

Today, five ARTs now support Australia Post’s value streams and associated enterprise strategies. One of those trains, the MyPost Consumer ART, sits within Australia Post’s Consumer market segment value stream. Established in 2015 to play a significant role in the shift toward customer centricity, MyPost Consumer is creating an omni-channel platform to offer personalized services to customers. The train’s primary focus: the parcel delivery experience, which sits at the heart of Australia Post’s business.

The train is made up of 110 cross-functional roles, with each team responsible for specific components of the parcel delivery experience. As a multi-channel, multi-technology program, only 30% of features are purely digital. The most impactful features require changes to multiple channels and enterprise technology systems.

“Getting the job done right is about focusing as much on how we work together, as what we are working on,” says Natalie Field, Head of MyPost Consumer. “We know there are many unknowns in achieving our program strategy and we don’t, and won’t, always get it right. However we also know that by respecting each other, and staying committed to rapid learning cycles, we will always come up with great solutions. “

The train has achieved strong outcomes over the past couple of years. Australia Post attributes the success of the train to several pillars:

Create a customer-centric culture
Building a customer-centric culture meant creating an environment that empowers the entire team to make fact-based, data-driven decisions and equipping everyone to be advocates for the customer experience.

Focus on metrics to drive business outcomes
A strong focus on measurement has resulted in significant positive impact across the organization’s primary success measures. To help achieve this outcome, teams are equipped with technology tools and the ability to collect and report on data. This empowers teams to learn fast about in-market feature performance and make changes when necessary. The result is a data-driven approach to how the train identifies, prioritises, implements, and learns from each Program Increment.

Improve continuously for greater predictability and performance
Success of the train hinges on an ability to improve continuously and focus relentlessly on evolving the experience to meet customer needs. The train adapts and responds to market demands, continually improving technology capabilities to advance the business across its digital channel, retail stores, delivery network, and call centre.

Raising Satisfaction and Throughput, with Lower Cost

A strong focus on measurement and learning to maximize business outcomes resulted in significant positive impact:

  • Improved first-time delivery – The First-Time Delivery rate jumped by 7 percentage points over 12 months.
  • Reduced cost – Australia Post reduced its infrastructure costs by 98%.
  • Predictability – The train consistently delivered on 80% or more of its objectives.
  • Customer satisfaction – The Net Promoter Score rose by 8 points over the course of one year.
  • Employee engagement – Employee satisfaction and engagement increased.
  • Industry accolades – The train was voted the Best Customer Centric Project in Australia / New Zealand by the CX Management Conference.
Australia Post - Implementing SAFe in Delivery Services

Australia Post continues to evolve and grow to meet the needs of its business. Its focus on continuous improvement means the organization ever challenges itself to create the next wave of trusted services for its customers.

“SAFe has really helped bring the organization along its transformation journey,” Field says. “Its real value has been in the way it links strategy with decentralized execution, using metrics to enable a high level of transparency and fact-based decision making to focus on achieving business outcomes.”

Back to: All Case Studies

Suggested Case Study:

Dutch Tax and Customs Administration

NHS Blood and Transplant – Adopting SAFe in Healthcare

NHS Blood and Transplant – Adopting SAFe in Healthcare

“Adopting SAFe has set in motion the skill development and mindset for successful organizational change even as we scale to new programs, release trains, and people.”

Gary Dawson, Assistant Director, Solutions Delivery

Challenge:

NHSBT sought to improve the business processes and the supporting IT environment in two major programs, and do so without adversely impacting its core business or service delivery to patients.

Industry:

Government, Healthcare

Solution:

SAFe®, Consulting and Coaching Service

Results:

In the first PI, NHSBT was able to deliver a committed, finite number of product features, as well as prioritize IT operations alongside the business part of the organization.

Best Practices:

  • Include all in the journey — The mutual understanding between IJI, managers and employee teams was critical. “It made the difference that we were bringing them on the journey—rather than telling them how we were going to impose something on them. It has been a key element in NHSBT’s success,” Dawson says.
  • Show and tell — “Show and tell” sessions (every two weeks) and then a mid-PI retrospective helped the business see the benefits of the change process and really feel part of it.

The partner that made it happen:


Introduction

NHS Blood and Transplant (NHSBT) is a joint England and Wales Special Health Authority that provides a blood and transplant service to the National Health Service—supplying blood to hospitals in England, and tissues and solid organs to hospitals across the United Kingdom. Each year, donors give approximately two million donations of blood and 3,500 organs—saving and transforming countless lives.

Safeguarding the blood supply and increasing the number of donated organs involves collecting, testing, processing, storing, and delivering blood, plasma, and tissue to every NHS Trust in England. NHSBT also matches, allocates, audits, and analyzes organ donations across the whole of the UK.

With an increased need for its services, the organization recognized that effective technology is crucial to the delivery of safe products and services for patients. While looking ahead to its corporate 2020 vision, NHSBT identified several goals: replace an aging IT infrastructure, migrate to SaaS cloud-based services, and replace the critical operational applications underpinning its activities while ensuring they remain compliant with external regulatory monitoring.

NHSBT sought to revolutionize the way it interacts with blood donors by taking full advantage of the opportunities afforded by digital technologies. That means careful consideration of the realities of existing interdependencies between the national databases and NHSBT services, systems, data, processes, and people.

Adopting SAFe in Healthcare

NHSBT identified the need to improve the business processes and the supporting IT environment in two major programs: ODT Hub and Core Systems Modernization.

“NHSBT was embarking on its most complex transformation program ever, initially focusing on the Organ Donation and Transplantation (ODT) area of its business,” notes Gary Dawson, Assistant Director, Solutions Delivery. “It needed to modernize a significant percentage of its core systems, platforms, and architecture along with re-aligning the infrastructure to more modern cloud-based technologies. The impact on the current business and practices couldn’t be underestimated across the organization—we were anticipating changes in how we work and how the system worked.”

It’s All About the People

NHSBT employees truly care about the organization and its work. Dawson, working with the wider NHSBT ICT organization, felt that it was important to correctly evaluate IT needs in line with organizational changes and be able to guide the system changes with the people using them.

“We recognized that both the overarching change and the adoption of a new technical platform and architecture—the effects on the culture of the organization—could, if not managed strategically, create a complex management problem and have an impact not only on the core business, but also the working relationships of the people within NHSBT,” Dawson says. “We needed a system and guidance to adapt and benefit from the changes and we were clear that the waterfall methodology that we had previously relied on wouldn’t support this change. We have dedicated and passionate people who work here, who really care about the cause and want to achieve the goals of the organization, but this change would only work if everyone was on the same page and we could go through the journey together.”

A New Approach to Adopt Change

The Chief Digital Officer had set the strategy for implementing Agile into NHSBT and brought on Dawson specifically with this in mind. From day one he worked extensively and closely with the Business, IT, and Program Delivery stakeholders to ensure cross-organizational support. After an initial meeting, they knew that an experienced consultancy like Ivar Jacobson International (IJI) would aim to understand NHSBT and work collaboratively to deliver solutions and training so that internal changes were manageable.

IJI suggested NHSBT use Scaled Agile Framework® (SAFe®) to help support the governance and manage both the organizational and technical changes. The ICT Leadership Team immediately took the view that this was the right methodology to achieve NHSBT’s goals and looked for an appropriate vehicle in which to introduce it. They decided the Organ Donation and Transplant (ODT) Hub Program as the most appropriate place to start implementation. ODT was initializing a hands-on software delivery and its timeline aligned well with the cadence of delivery that the framework provided. In addition, funding was in place and all the teams involved were based in one location. It would act as an ideal start and pilot for other elements of the organization to observe.

Because ODT was the first in a series of transformational changes, it would also be the model that other parts of the organization would take as an example, so it was crucial to get it right from the start. “IJI’s expertise with Agile transformation programs was a perfect fit with what we were aiming to do. Because we’d be working with new team groupings, we wanted to assist employees with transitioning to new working relationships and processes and also address the naturally risk-averse elements,” Dawson says. “We had to stay within regulatory standards. Rapid and vast change, if not done properly, has the potential to be disruptive, and actually hinder advancement. We chose Ivar Jacobsen International to provide company guidance, including coaching and training services, for the implementation of SAFe at NHSBT.”

Adopting SAFe in Healthcare

A Proven Framework in SAFe®

SAFe offers a broad range of content and phased implementation for organizations looking to increase productivity, change system structures, increase employee training, add solutions-based management and develop greater efficiencies across company platforms and people.

Because proper preparation is critical to set the stage for smooth adoption, IJI delivered a two-day workshop, ‘Leading SAFe,’ that engaged managers interactively while explaining what SAFe was and how to implement it properly.

Meanwhile, Dawson and IJI also began to structure team units. They identified product managers and product owners working collaboratively to define their roles within SAFe and guided them on SAFe practices. Training roll-outs started with 10 or 12 courses, ranging from large-room sessions of 30-40 people for SAFe overviews and discussions of how it could work within NHSBT. These were followed over a two-month period by smaller and more interactively focused sessions for product managers and owners intended to further guide them and increase engagement. Sessions included six to 10 people with the appropriate attendees to maximize the interaction and cross-functional engagement—even at the point of training.

Meanwhile, program managers, with Dawson, started to work on organizational components, such as planning sessions across the organization (75 – 80 people). Planning included who would be involved, as well as logistical challenges. Dawson spent considerable time explaining the rollout and SAFe implementation to all levels of employees to facilitate understanding and new team groupings. IJI was on hand at all stages of implementation to guide, coach, teach, and assist teams to transition to SAFe, following a strategic Program Increment (PI) cycle that ensured SAFe was adopted by employees with secure checkpoints and feedback along the way.

Building Success

Adopting SAFe in Healthcare

Over the first Program Increment (PI), NHSBT’s ODT program came through on most of its deliverables. “It was amazing how much we were able to do in such a short time,” Dawson notes. “Now that we’ve done that, we can see what we need to do for future PIs and are continually able to refine and understand the teams’ velocity; it’s all falling into place and people really are committed.”

In that first PI, they were able to develop and learn to work effectively as a team and were able to deliver a committed, finite number of product features, as well as prioritize IT operations alongside the business element of the organization.

During the short introduction phase of three to four months, they were able to not only onboard and train all the teams aligned to the Release Train, they were also able to get the business component of NHSBT aligned with IT. There were challenges—such as integrating business managers into the teams and defining product owners—but “show and tell” sessions (every two weeks) and then a mid-PI retrospective helped the business see the benefits of the change process and really feel part of it.

“We would never have had that level of interaction in a waterfall delivery,” Dawson says. “To achieve the levels of understanding of both the technology and deliverables—along with all the interdependencies—would have taken months of calls, meetings, and discussions. We planned the next three months in just two days and now we retain that level of engagement on a daily basis.”

SAFe has become part of everyday procedures at NHSBT, with a series of checkpoints and loops that ensure communication is clear and efficient between teams and individuals. IJI understood that it was important to Dawson and NHSBT that change occurs but not at the cost of quality or control, and that value to the business should be equal to the ability of the organization to cope with the rate of change. NHSBT was able to build Agile confidence across the ODT program—senior stakeholders could support the cultural change because SAFe provides the governance required to build in the needs of Quality Assurance and regulators.

Successfully Scaling to New Programs

Having delivered the first MVP (Minimum Viable Product) of the ODT Program, it is clear that the introduction and embedding of SAFe within NHSBT has begun to provide early delivery of significant business benefits.

NHSBT has now run two SAFe big-room planning events for its Core Systems Modernization (CSM) Program, which is potentially a much larger program to replace its core blood offering system relating to blood, blood-derived products and tissues.

“We’re definitely not standing still,” Dawson says. “We are building momentum and will continue to run with the same rhythm that SAFe has provided us with our ODT program. Adopting SAFe has set in motion the skill development and mindset for successful organizational change even as we scale to new programs, release trains, and people.”

Back to: All Case Studies

Suggested Case Study: Royal Philips

pôle emploi – Benefits of Using SAFe in an Employment Agency

pôle emploi - Benefits of Using SAFe in Employment Agency

Pôle emploi is the French national employment agency tasked with providing and processing benefits for the unemployed and seniors, helping the unemployed find jobs, and providing employers with recruitment resources. They employ over 54,000 civil servants through 900+ agencies, and publish more than 4 million job offers annually.

Industry:

Government

Overview

In 2014, the agency processed 8 million requests for financial aid, distributing $31.7 billion euros in benefits.

In early 2015, pôle emploi was asked to develop a new process for job seekers, no small feat given that the organization was operating in a legacy environment which included a 1600-member IT Department comprised of Scrum and waterfall teams, working with new technology as well as COBOL systems, and integrating work from several external suppliers

They first met with key stakeholders to create the program context and agree on realistic scope, then explored options to fulfill the commitment, and sought a solution to meet the needs of these key areas:

  • What can we do to meet our commitments ?
  • What can we do to stay in sync?
  • What can we do to increase team collaboration?
  • What can we do to reduce integration risks on such a large scope ?
  • How can we maintain a good vision of the product?
  • How can we track the progress of so many teams?
Benefits of Using SAFe in Employment Agency

In early 2015, pôle emploi launched a SAFe pilot program to see how the Framework would work within their unique context. As part of this effort, they launched an Agile Release Train (ART) with 5 Scrum teams running on 3-week sprints, managing five cross-functional initiatives. Through Program Increment planning, they brought together all the key actors in the same room to identify key features that needed to be integrated, and dependencies between the different software components. pôle emploi created a new role, Delivery Manager, to track overall progress, and used IBM’s Rational Team Concert (RTC) to track team progress.

After the first few months, they were able to identify where the Framework mapped easily to their context, where it didn’t, and how to reconcile some of those differences. For instance, they opted to move from the Delivery Manager role to a Release Train Engineer (RTE) role, as defined in SAFe and began using SAFe-recommended templates to increase the visibility of the new business requirements. They also decided to align ART with their business program.

Today, the IT organization operates with both agile and non-agile teams collaborating, and is transitioning the non-agile teams to agile practices through their participation in the SAFe ART. They are working within the Framework to identify areas for continuous improvement and address questions such as:

  • How do we manage to take the business further within Agility?
  • Could WSJF help our prioritization process?
  • Who should assume the Product Management role in our organization?
  • How can we move forward with the system team?
  • Should we organize PO sync?
  • Who can be assigned the System Architect role?
  • Who should deal with the enablers and stories?
  • Will we be able to dissociate PI from our quarterly IT releases?
  • What do we need to do to move more teams to an agile cycle?

Get the rest of the story—including the update—below.

Many thanks to the team at pôle emploi for providing the study, and sharing your experience with the SAFe Community: Cécile Auret (SPC4), Methods Engineer, Jerome Froville (SPC4), Methods Engineer, and Michel Levaslot, Manager.

Back to: All Case Studies

Suggested Case Study:

Centers for Medicare & Medicaid Services